As long as it has good UV resistance and metal adhesion. Use one that is not acetic acid based. GE Silicone II is a good one.You only need silicone on the storm collar and any silicone is fine there
As long as it has good UV resistance and metal adhesion. Use one that is not acetic acid based. GE Silicone II is a good one.You only need silicone on the storm collar and any silicone is fine there
No they have single wall at canadian tire 36inch lengths. I'm going to buy two, they don't ship so I have to go to the store.
It says everything should be herein 3 days, so hopefully by next weekend I'll have everything installed. Will definatly post lots and lots of pics.
History may be repeating itself.Yes that's what I was referring to about doing it right this time
He is getting single wall you just cut it to length and slide the stove under the chimney if you don't use a telescoping section. No big deal. And yes the support box will need to be cut to match the pitch of the roof.History may be repeating itself.
If you can buy a mixture of lengths that will get you to approx where your ceiling support will be hanging down, then you may be able to get away without using telescopic pipe but you would need to install the ceiling support last, then attach the ceiling support to the support boards which I dont see in your picture, then the roof flashing. Then the chimney inside the ceiling support box, then your storm collar, then your cap and you are done. Seal the storm collar, go build a test fire.
Also not sure if you considered a stove adapter. Your pipe might just seat right on there.
Have you checked that this stove will draft properly with that short run?
one final thing to consider. Your rafters are only 2x4's so you wont have much wood to attach your ceiling support box and it's probably going to be hanging down really low, and you will likely need to use tin snips to fold over the ceiling support box over on top of the roof and under the roofing materials. Search for the ceiling support box install instructions that show how to overlap the extra ceiling box materials under the roofing materials. Hopefully you havent shingled yet, but if you have be prepared to carefully pull up the shingles to get the ceiling box material and roof flashing under the shingles. Dont do it like most people do which is get the top row of shingles over the flashing. Get as many as you can.
With single wall, you can also place in the last section of the crimped end snapped together and then work the snap closed (from crimp end to open end) until it is all in place.He is getting single wall you just cut it to length and slide the stove under the chimney if you don't use a telescoping section. No big deal. And yes the support box will need to be cut to match the pitch of the roof.
Yeah draw bands are a decent option but they cost about the same as a telescoping section and can leak potentially because the bottom joint will not be run the right direction. I have never tried snapping together in place but it could work depending on the pipe. Some of it can be a real pita.With single wall, you can also place in the last section of the crimped end snapped together and then work the snap closed (from crimp end to open end) until it is all in place.
However, it may be best/easier to just use a drawband connector for when you remove/change the stove pipe. Don't over tighten the draw band! (ha!)
You might as well add one of these now as I'm thinking you're gonna wish you had otherwise.
Kinda like protection. Better to have it and not need it than to need it and not have it.Yeah draw bands are a decent option but they cost about the same as a telescoping section and can leak potentially because the bottom joint will not be run the right direction. I have never tried snapping together in place but it could work depending on the pipe. Some of it can be a real pita.
With their shirt chimney I really doubt they will need a damper
I would still put framing in.Just reading a bunch of stuff on support boxes and it seems that if I cut and screw it to the top of my roof that I don't need to frame it on thr inside of my shed?
And I was wrong about 2inchs away from combustibles I think it needs to be 18inches.
Chimney pipe clearance is 2". Single-wall stove pipe requires 18" clearance. Double-wall stove pipe requires 6" from the side.And I was wrong about 2inchs away from combustibles I think it needs to be 18inches.
Sorry should of clarified, thank you.
I just got all the stove pipe today!
So my goal is to install it Monday.
Can I cut the support box down a bit so it's not hanging so low on my ceiling? Or just deal with it.
Just metal on the wall won't change anything. It needs to be a proper ventilated heat shieldSo i want me to make sure I'm reading this right, if I have a double wall connector my distance for "f" would be 9". If I use single wall with let's say sheet metal on the wall can I still have 9"? Or even that heat shield thing I see for the pipes?