Call any concrete supplier and get a price for flowable fill. Its a very lean concrete. It gets delivered in a truck like concrete and fills in all the voids. It sets up enough that it cant be dug with a hand shovel but can be dug with a backhoe. I have used it to fill old an old pipeline so it wouldn't collapse and recently had about 500 yards placed under a foundation for small power plant.
Last edited: