Hi all. Today maybe the day for a first fire if I can resolve a couple of last minute issues.
Question for today is, when pressure testing, how long do I need to hold air pressure, and at what pressure? I tested part of my layout yesterday at just under 30lbs of air (above that the pressure relief kept releasing air), and was able to hold close to that pressure for an hour or two (minor drop over that time period).
But this morning I come out and the pressure is basically at zero. Is air more likely to leak than water? If I can hold air for an hour or two, will that be good enough or does it basically need to maintain pressure indefinitely?
Question for today is, when pressure testing, how long do I need to hold air pressure, and at what pressure? I tested part of my layout yesterday at just under 30lbs of air (above that the pressure relief kept releasing air), and was able to hold close to that pressure for an hour or two (minor drop over that time period).
But this morning I come out and the pressure is basically at zero. Is air more likely to leak than water? If I can hold air for an hour or two, will that be good enough or does it basically need to maintain pressure indefinitely?