I have my Paxo 40 with 1000 gallons storage up and running. The boiler is in an outbuilding 75 feet from the house with 1000 gallons (2x500 propane) in the basement. With a lot of help from Mark at AHONA, and Nofossil's notes, I got the system installed and running in about 6 weeks - picked up unit 11/6 and first fire 12/16 (delays getting 1 1/4 copper fittings at a reasonable price). Underground piping is 1 1/4 PEX and the rest is mostly copper. I do not have my heat exchanger in yet to connect the tanks to the radiant in floor, so I basically have a VERY BIG radiator in a 2500 sf basement. I use a standard box fan to move the air around. This actually works to reduce the load on the existing propane system and makes for a nice warm basement. Basement is about 72 degrees right now, the slab near the storage tanks is up to 80F. One week in to firing, I am still learning how to reliably fire the boiler. I resplit some of my wood today and it seems to burn a little better.