Just the fact that it starts at 3" and requires you to move up in size depending on length and bends to reduce the restriction to the site flow implies minimum.
They say 3" as it is cheaper than 4" and makes it look more cost effective for new installations.
The flow to ensure combustion is the key.. And thus requires a minimum (or they would stay at 2")
They say 3" as it is cheaper than 4" and makes it look more cost effective for new installations.
The flow to ensure combustion is the key.. And thus requires a minimum (or they would stay at 2")