So due to get my M55 insert next week. The dealer stopped by today to do a pre inspection check to make sure everything was good. They said it will be more difficult than anticipated as I have a factory installed fireplace that will need to be removed first. The current fireplace is a Superior BCF 3885 (tried to attach pictures but the size was too big and it rejected it). They will then put the pellet insert in it's place once removed. I thought it would be a much easier install.. but I really don't like the waste the current factory fireplace is, so I'm planning on moving forward. They said additional labor for the install would run a couple hundred dollars. I will keep the forum up to date. Anyone else go through this process of having to remove an existing factory fireplace to put in a pellet insert? Any watch outs I should mention to the installers?
Thanks!
Thanks!
He's in a manufactured home. Are you?
So PUmped. Here is a picture of the stove being wheeled into the house.. (M55 is a monster). Also the finished product. They put mortar around the surround.. it's still wet they said it will continue to dry lighter and lighter and will blend in very well with the existing color cement. Working like a champion. I have the decoritive logs in right now.. just while I show it off to everyone but I plan to pull them out and only use them in the summer as I've read in this forum that they can make it a pain to clean. Enjoy the pics.... I'm going to enjoy the heat (just in time for a 50 degree weekend).