muncybob said:How did you set the posts? I'm planning to put a base of 6" or so stone in the bottom of the hole, set the post in and add some more stone about 4" or so...then add dirt and begin tamping. Even though the PT posts are ground contact rated I thought this would help to drain water away from the posts.
The holes are 36" deep and then I poured 8" of concrete in the bottom of them, set the posts in squared and plumbed them, added about 8" of gravel around the bottom of the post, and them tamped the remaining dirt in around them. It's probably overkill but quikrete is cheap and I already had the gravel. Alot of guys around here just set bricks or something like it in the bottom of the hole and set the post on that so they don't have to wait on the quickrete to set up.