I am shure someone here has rebuilt a gasser boiler. I just got a Tarm 2000 (1993) 229000 btu, dual fuel boiler to putter around on. It does not hold pressure but am wondering if it is a waist of time or should i "dig" into it. I bought it for the doors, i have a MB 55 that checks out alright but the door frames were cracked from them being left open.Winter is coming, work slows and i do know how to weld. Looking for anyones opinion.
Thanks
Thanks