D
dorkweed
Guest
Hearth is built. Finished up screwing down the last of the Durock. I've never done a tiling job before, so this'll be a first for me. I've reading doing a lot of reading on the subject; but I've got some questions....
1. Do I tape the Durock seams at the same time I start the tile?? Or should I tape the seams, let it set a day, and then tile?? I've read of guys doing it both ways.
2. Should I tape the seam where the hearth Durock meets the wall Durock??? My house moves a lot, so that's why I ask this.
3. Tile the hearth first, or the wall?? And why??
Thanks.
1. Do I tape the Durock seams at the same time I start the tile?? Or should I tape the seams, let it set a day, and then tile?? I've read of guys doing it both ways.
2. Should I tape the seam where the hearth Durock meets the wall Durock??? My house moves a lot, so that's why I ask this.
3. Tile the hearth first, or the wall?? And why??
Thanks.