I just had to tell someone! "News flash Harman 1500 SF wood / coal furnace with domestic hot water coil on order" I wrote a big fat check for half down. The retailer said should be in about two weeks or so. Let the games begin. Install new chimney, set unit, wire new electric circuit, new sheet metal, plumb up hot water coil. And what ever else I missed.