I had posted about this one before, but the ground is now broken.
(broken link removed to http://www.standard-freeholder.com/ArticleDisplay.aspx?e=1670408)
Going to be a year before they start producing, but a big plant - designed for 450,000 tonnes (about 496 short tons) per year. Aiming not for the home heating market, but power generation. 60 acre site, $80 million plant, solar powered with gas backup.
Cheers
(broken link removed to http://www.standard-freeholder.com/ArticleDisplay.aspx?e=1670408)
Going to be a year before they start producing, but a big plant - designed for 450,000 tonnes (about 496 short tons) per year. Aiming not for the home heating market, but power generation. 60 acre site, $80 million plant, solar powered with gas backup.
Cheers