I searched for a long time and couldn't find the answers I'm looking for.
Don't know which should be on top for (1) stratification (2) shoulder season, summer DHW usage, assuming one tank would need to be shut off.
I'm trying to accomplish this with 7ft of clearance. That is why I'm entertaining the idea of side by side installing.
Furthermore it is an old dug out basement with rock walls and a simple pour in concrete floor. Unsure what to do to make sure I can support the weight.
All this or place storage outside.
Don't know which should be on top for (1) stratification (2) shoulder season, summer DHW usage, assuming one tank would need to be shut off.
I'm trying to accomplish this with 7ft of clearance. That is why I'm entertaining the idea of side by side installing.
Furthermore it is an old dug out basement with rock walls and a simple pour in concrete floor. Unsure what to do to make sure I can support the weight.
All this or place storage outside.