Hi All,
This summers project, replacing the secondary combustion package (part #19 on the diagram).
I am very unconfident approaching this job. Anybody ever done it? Hints? Warnings?
Going to take the firebrick out to have a good look at the package, but I know I am going to find
a severely worn out piece of refractory material. Over the winter, chunks of "toasted" material
began to fall down, about the size of a 50cent piece, maybe 2 or 3 times.
What would happen if I didn't replace this piece.....don't panic....this is just curiosity.
The stove burnt like a champ all winter, not a single problem.
Cheers,
Donna
This summers project, replacing the secondary combustion package (part #19 on the diagram).
I am very unconfident approaching this job. Anybody ever done it? Hints? Warnings?
Going to take the firebrick out to have a good look at the package, but I know I am going to find
a severely worn out piece of refractory material. Over the winter, chunks of "toasted" material
began to fall down, about the size of a 50cent piece, maybe 2 or 3 times.
What would happen if I didn't replace this piece.....don't panic....this is just curiosity.
The stove burnt like a champ all winter, not a single problem.
Cheers,
Donna